MailWizz Engineering Center · Version 3.8
Production Installation
MailWizzv4.1 frameworkProduction reference
A production-oriented MailWizz installation checklist covering prerequisites, filesystem ownership, TLS, cron readiness, and post-install validation.
Production rule: test changes on a staging copy, record the previous state, and define a rollback before modifying a live installation.
Engineering approach
- Document the current topology, versions, ownership, credentials, and traffic flow.
- Change one controlled variable at a time and preserve before-and-after evidence.
- Validate from MailWizz, the transport layer, DNS, and the receiving provider—not from one dashboard alone.
- Monitor queue age, SMTP outcomes, bounce processing, complaints, and database growth after deployment.
Implementation checklist
- Confirm prerequisites and dependencies.
- Use least-privilege service accounts and unique credentials.
- Keep sending identities aligned across visible From, envelope sender, DKIM, PTR, and HELO.
- Prevent overlapping cron executions where duplicate work is unsafe.
- Store logs long enough to investigate delayed provider responses.
- Test rollback and recovery procedures.
Verification
# Record the exact command, timestamp, exit status and relevant log lines.
# Validate one controlled test campaign before restoring normal volume.
# Compare acceptance, delivery, bounce and complaint metrics.Common mistakes
- Increasing concurrency before finding the actual bottleneck.
- Sharing credentials or sending pools across unrelated customers.
- Ignoring temporary SMTP responses until queues become stale.
- Changing application, relay and DNS settings simultaneously.
- Keeping backups that have never been restored in a test environment.
Related resources
MailWizz Engineering Center · Interactive builders · Deployment examples